Сonveyor rail
Engineering work with the subsequent manufacture of heavy-duty conveyor rails.
The following works were carried out:
- the working conditions of heavily loaded conveyor rails have been studied;
- it was carried out OCD on defect-free hardening of steel 65G to hardness 60HRC;
- product flow chart is compiled;
- the party of rails is made and shipped;